If 3 over 4 ton of pebbles covers 4 over 5 of a garden, how many tons of pebbles are required to cover the entire garden?

User Niana
by
7.8k points

2 Answers

4 votes
(3/4) / (4/5) = x/1
cross multiply
4/5x = 3/4
x = 3/4 * 5/4
x = 15/16 tons to cover entire garden
User Adam Tucholski
by
7.8k points
1 vote

Answer:

The pebbles are required to cover the entire garden is
(15)/(16).

Explanation:

Consider the provided information.

Convert the provided information into mathematical expression.

3 over 4 ton can be written as
(3)/(4) and 4 over 5 can be written as
(4)/(5).

Now, consider the pebbles are required to cover the entire garden is x.

Therefore


(3)/(4)=(4)/(5)*{x}


x=(3)/(4)*{(5)/(4)}


x=(15)/(16)

Hence, the pebbles are required to cover the entire garden is
(15)/(16).