a contractor was hired to remodel a kitchen. she can complete 3/8 of the kitchen remodeling project in one day. how much of the kitchen is left to remodel after two days?

User SYOB SYOT
by
6.7k points

2 Answers

4 votes
Nothing. The improper fraction for what she has done could be 9/8.
User Bummzack
by
6.6k points
3 votes
she would have 5/8 days left
User Tvb