An electrician can wire on 4.5 houses in a week. How many months will it take her to wire 55 houses if she wires the same number each week and figures on 4.5 weeks per month

User Xta
by
7.6k points

1 Answer

5 votes
i believe the answer is 2 months and 4 weeks.. at 2months and 3 weeks however she has wired 54 houses. so you need to add another week because at 2 months and 3 weeks you havent reached 55 houses yet.