We have the next given information:
- inlet pipe fill rate = 1/20 = 1job/hour
-The drain pipe empty rate = 1/45 job/hour
- The pool is 1/3 filled, then we need to fill 2/3.
If both are open, we have the next combined rate:
Combined rate =1/20 - 1/45 = 25/(20*45) = 25/900=1/36 = 1job/hour
Now,we need yo use the next equation:
rate * time = work done
Set x for time.
Replacing:
1/36 * x = 2/3
Multiply both sides by 36:
Hence, it will take 24 hours to fill the pool