153k views
4 votes
Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? WBS (Work Breakdown Structure) MRP (Material Requirements Plan) MPS (Master Production Schedule) ERP (Enterprise Resource Planning)

User Bklimt
by
8.7k points

1 Answer

2 votes
The correct answer for the question that is being presented above is this one: "MPS (Master Production Schedule)." MPS is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled.
User Emerson Maningo
by
8.0k points