Given:
10 windows per hour.
10 windows per hour is the unit rate. We need to divide the total number of windows by the unit rate to get the length of time.
200 windows ÷ 10 windows/hr = 20 hours.
It would take a window-washing crew 20 hours to complete a building with 200 windows.