Mr. Stephens needs to haul 1,518 tons of rock from a construction site. His dump truck can hold 26 tons per load. How many tons will Mr. Stephens need to haul in the last load to move all of the rock?
asked
Oct 25, 2018
53.6k
views
5
votes
Mr. Stephens needs to haul 1,518 tons of rock from a construction site. His dump truck can hold 26 tons per load. How many tons will Mr. Stephens need to haul in the last load to move all of the rock?
Mathematics
middle-school
Lochlan
asked
by
Lochlan
8.3k
points
answer
comment
share this
share
0 Comments
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
1
Answer
5
votes
Mr Stephens will need to haul in 58.4 tons o move all of the rocks
JohnnyFun
answered
Oct 31, 2018
by
JohnnyFun
8.9k
points
ask related question
comment
share this
0 Comments
Please
log in
or
register
to add a comment.
← Prev Question
Next Question →
Related questions
asked
Dec 4, 2019
10.2k
views
mr stephens needs to haul 1,518 tons of rocks from a construction site. His dump truck can hold 26 ton per load. how many tons will Mr.Stephens need to haul in the last load to move all of the rocks?
Omegaspard
asked
Dec 4, 2019
by
Omegaspard
7.9k
points
Mathematics
college
2
answers
3
votes
10.2k
views
asked
Dec 4, 2021
54.5k
views
A load of bauxite has a density of 3.11 . If the mass of the load is 220. metric tons, how many dump trucks, each with a capacity of 11 cubic yards, will be needed to haul the whole load? (Express your
Arvidurs
asked
Dec 4, 2021
by
Arvidurs
7.8k
points
Chemistry
college
1
answer
3
votes
54.5k
views
asked
Nov 2, 2019
140k
views
two dump trucks have capacities of 10 tons and 12 tons. they make a total of 20 round trips to haul 226 tons of topsoil to be used to landscape a new development. how many round trips did each truck make?
Piotr Czarnecki
asked
Nov 2, 2019
by
Piotr Czarnecki
7.8k
points
Mathematics
high-school
1
answer
4
votes
140k
views
Ask a Question
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.
9.5m
questions
12.2m
answers
Other Questions
How do you can you solve this problem 37 + y = 87; y =
How do you estimate of 4 5/8 X 1/3
A bathtub is being filled with water. After 3 minutes 4/5 of the tub is full. Assuming the rate is constant, how much longer will it take to fill the tub?
i have a field 60m long and 110 wide going to be paved i ordered 660000000cm cubed of cement how thick must the cement be to cover field
Write words to match the expression. 24- ( 6+3)