Johnson's rule gives optimal answer for what type of scheduling problems?

1 Answer

5 votes
The answer is two-machine flow shop. The two-machine flow shop issue in which each activity is prepared through an in-house framework or outsourced to a subcontractor. A calendar is set up for the in-house employments, and execution is measured by the makespan.