We are given the two constraints:
x ≥ 5 and y ≥ 10
Now the other constraint must of course be based on the sum of the two. It was given that the budget is $5000 so the sum must be greater than that, that is:
500 x + 150 y ≤ 5000
9.4m questions
12.2m answers