Answer:
13.64 minutes
Explanation:
The first machine works at the rate x = 1 bale/ 25 min.
The second machine works at the rate y = 1 bale/30 min.
The combined rate is
x + y = 1/25 + 1/30 bales/min
= (30 + 25)/(25*30) = 55/750
= 11/150 bales/min
The time for both machines to pick 1 bale of cotton is
(1 bale)/(11/150 bales/min) = 150/11 min = 13.64 min
So if you take rsm, you have to input 13.64 otherwise it won't work. :)