If 6 men can do a piece of work in 14 days, how many men are needed to do the work in 21 days?

User Jonno
by
7.6k points

2 Answers

6 votes
The answer should be 9 workers due to 7 day periods.

21/7 =3
3+6 =9

Answer:9
User Susundberg
by
7.3k points
6 votes
Nine men are needed.
hope this helps
User Nitesh Tarani
by
8.0k points