A construction crew needs to build a road that will be 20 miles long. The crew already completed a stretch that is 6.44 miles long and another that is 8.62 miles long.

How much more road does the construction crew need to build?

(A) 2.18 miles
(B) 4.94 miles
(C)11.38 miles
(D)13.56 miles

User Roshan Pal
by
6.3k points

2 Answers

2 votes

Answer: B 4.94

Step-by-step explanation: 'cuz my brain is ALWAYS right!!

User Virindh
by
6.8k points
3 votes
Your answer would be (B) 4.94. Hope this helped!
6.44 + 8.62 = 15.06
20 - 15.06 = 4.94