29.7k views
2 votes
In an agile project, teams are given several requirements but only deal with one at a time, with each iteration being referred to as a __________.

User SLoret
by
8.1k points

1 Answer

4 votes

The iteration that are each being referred is a sprint. A sprint is being defined as a time that is being set in which are done in order to meet the tasks that is needed to be made for it to be accepted or to complete them.

User Terhechte
by
8.7k points