Machine setminus−up would most likely be classified as a​ ________ cost.

User Gutiory
by
7.8k points

1 Answer

4 votes
It is called batch level cost. It is the generation costs that are brought about just when another group is handled. These expenses may incorporate things like set-up time, moving materials, and stacking machines. For these costs, it doesn't make a difference what number of units are created in the cluster.