Answer: 2.67 donut/minute
To find the average rate, you need to know the donut production and the time needed. In this question, the unit used is dozen donut and minutes. Assuming you want the rate to have donut/minute then the calculation would be:
Rate:
4x12 donuts / 18 minute
48 donut /18 minute
2.67 donut/minute