207k views
4 votes
a road crew can repave 1/48 of a road each hour. they must repave a road that is 3/8 miles long. how long will it take the crew to repave the road?

User Yaya
by
8.3k points

2 Answers

2 votes

Answer:

It will take 18 hours.

Explanation:

Given,

The crew can repave
(1)/(48) miles,

The length of road they must repave =
(3)/(8) miles,

Hence,


\text{The time taken by them to repave the road}=\frac{\text{The road they must repave}}{\text{The length they repave per hour}}


=(3/8)/(1/48)


=(144)/(8)


=18\text{ hours}

User Mahmoud Gamal
by
8.1k points
5 votes
3/8 / 1/48 = 3/8 x 48/1 = 144/8 = 18 hours
User Dave Butler
by
7.8k points