199k views
1 vote
An oil company operates two Southern refineries. The Alabama facility produces 500 barrels of high-grade oil and 200 barrels of medium-grade oil per day. The Texas facility produces 600 barrels of high-grade and 400 barrels of medium-grade oil per day. By operating each facility for a certain number of days, the company produces exactly 15,000 barrels of high-grade and 8400 barrels of medium-grade oil. How many days must each facility operate to produce the desired result?

User Rohitkulky
by
7.1k points

1 Answer

6 votes
Call x the number of days the Alabama facility operares and y the number of days the Texas facility operates

Number of barrels produced:

Facility Alabama Texas total

HIgh grade production: 500x 600y 15,000

Medium grade production 200x 400y 8,400

Equations

500x + 600y = 15,000
200x + 400y = 8400

Divide each equation by 100

5x + 6y = 150
2x + 4y = 84

Multiply first by 2 and second by 5 =>

10x + 12y = 300
10x + 20y = 420

Subtract the first from the second:

20y - 12y = 420 - 300
8y = 120
y = 120/8
y = 15

Replace y value on any of the equations:

2x + 4y = 84 => 2x = 84 - 8y =
2x = 84 - 4(15)
2x = 84 - 60
2x = 24
x = 24/x
x = 12

Answer: the Alabama facility must operate 12 days and the Texas facility must operate 15 days.

User Tom Corelis
by
8.5k points