189k views
2 votes
A realty developer sell residential lots fir 4,000 per square meter plus a processing free of 25,000. one of the lots the realty developer is seling cost 625,000.

User Domchi
by
7.7k points

1 Answer

2 votes
selling cost = (price * lots) + processing fee

625000 = ( 4000 * lots) + 25000
625000 - 25000 = 4000 * lots
600000 = 4000 * lots

lots = 600000 / 4000 = 150.
User Galarant
by
7.5k points