B(t) = 50 * e^(2.5t) Grow to 1000
1000 = 50e^(2.5t)
divide both sides by 50
20 = e^(2.5t)
To clear the e, take the LN(natural log) of both sides.
ln 20 = lne^(2.5t)
We know that lne = 1, so we use this rule and the power rule to bring the 2.5t out of the power and in front of the lne.
ln20 = 2.5t * lne
ln20 = 2.5t * 1
ln20 = 2.5t
divide both sides by 2.5
t = 1.2 hours
CHECK
y = 50e^(2.5*1.2)
y = 50 * 20
y = 1000 CHECKS