258,475 views
19 votes
19 votes
A construction worker is pouring concrete stairs. The first step requires 1.6 cubic feet of concrete, and the first 5 steps require a total of 24 cubic feet. If the steps follow an arithmetic series, how much concrete is required for the first 10 steps?48 cubic feet88 cubic feet106 cubic feet160 cubic feet

A construction worker is pouring concrete stairs. The first step requires 1.6 cubic-example-1
User Martijn B
by
2.7k points

1 Answer

8 votes
8 votes

For an arithmetic series

a, a+d, a+2d, a+3d, ...

where a is the first term and d is the common difference, the sum of n terms equals


S_n=na+(n(n-1))/(2)d

Since the first step requires 1.6 cubic feet of concrete, a = 1.6.

Now, the first 5 steps require 24 cubic feet of concrete, that is,


S_5=24

So,


\begin{gathered} 5(1.6)+(5\cdot4)/(2)d=24 \\ 8+10d=24 \\ 10d=16 \\ d=1.6 \end{gathered}

Find the concrete required for 10 steps.


\begin{gathered} S_(10)=10(1.6)+(10\cdot9)/(2)(1.6) \\ =16+45(1.6) \\ =88 \end{gathered}

So, 88 cubic feet of concrete required for thr first 10 steps.

The second option is correct.

User Aaron Balthaser
by
2.6k points