Answer:
6 weeks
Step-by-step explanation:
Optimistic Completion Time - 11 weeks
Most likely completion time - 14 weeks
Pessimistic completion time - 23 weeks
Compute the expected task variance in weeks. Recall that Variance is a measure of dispersion - a measure that shows the distance or spread between or among values of a variable.
Expected Variance is the average of the variance values.
First,
the variance between optimistic CT and most likely CT is (14 - 11) = 3 weeks
Second,
the variance between pessimistic CT and most likely CT is (23 - 14) = 9 weeks
The expected variance is the average of these two values and that's (3 + 9)/2 = 12/2 = 6 weeks
So the expected variance from the mean completion time of 14 weeks is 6 weeks before or 6 weeks after. This accommodates both the optimist and the pessimist.