142k views
4 votes
Jonathan has 7 hours to finish three jobs. If the first job takes him 2 3/4 hours and the second joob takes him 1 5/6 hours, how much time does he have to complete the third job?

Answer with supporting work please:

User Djibril
by
5.7k points

1 Answer

6 votes
this is a sum problem first you add the two known (2 3/4 + 1 5/6)
=4 7/12 hours for these both jobs
after you subtract this number from 7
2 5/12 is the answer
hope this helped
User Xuanyue
by
5.7k points