29.9k views
2 votes
In an equipment replacement decision, the cost of the old equipment is a(n)

A. Incremental cost

B. sunk cost

C. Relevant costs

D. Opportunity cost

User Mano
by
7.3k points

1 Answer

5 votes
In an equipment replacement decision, the cost of the old equipment is called Bsunk cost.
User Sid Datta
by
6.6k points