For the answer to the question above, I assume this is the complete question above,
What is a formula used for determining the monetary predictor of neglect
A) a2 + b2 = c2
B) B < PL
C) EA = π r2
D) X = Y/Z
If that's so, this is the answer
The answer is C) EA = π r2