169k views
5 votes
A construction crew has just finished building a road. the crew worked for 10 days. if they build 2 3/4 kilometers of road each day, what is the total length of road they built?

User AniketGole
by
8.8k points

2 Answers

3 votes

Final answer:

The construction crew built a total length of 27.5 kilometers of road by working for 10 days, building 2 3/4 kilometers each day.

Step-by-step explanation:

To find the total length of road built, we need to multiply the length of road built each day by the number of days the crew worked. In this case, the crew built 2 3/4 kilometers of road each day, and they worked for 10 days.

To calculate the total length, we can use multiplication. 2 3/4 can be written as an improper fraction as 11/4. So, the total length of road built is 11/4 * 10 = 110/4 = 27.5 kilometers

Therefore, the construction crew built a total length of 27.5 kilometers of road.

User Ericgio
by
8.1k points
6 votes
2.75 x 10 = 27.5 or 27 1/2 kilometers total
User Creature
by
7.9k points