55.6k views
5 votes
A machine produces 247 bolts in 26 minutes. At the same rate, how many minutes would it take to produce 209 bolts?

User Andand
by
7.8k points

1 Answer

5 votes

Answer:

22 minutes

Explanation:

247/26 = 9.5 bolts per minute

209/9.5 = 22

or

247/26 = 209/x

cross multiply

247x = 209 x 26

247x = 5434

divide both sides by 247

x = 22 minutes

User Terraelise
by
7.6k points