17.1k views
5 votes
The goals of __________ are to determine the work load at which systems performance begins to degrade and to identify and eliminate any issues that prevent the system from reaching its required system-level performance. user acceptance testing system testing volume testing integration testing

User Egis
by
8.4k points

1 Answer

4 votes
Volume testing does these things
User Hugo Seleiro
by
8.4k points