A forklift raises a 1020 N crate 3.50 m up to a shelf l. How much work is done by the forklift on the crate? The forklift does J work on the crate.

User Meaningqo
by
6.9k points

2 Answers

1 vote

A forklift raises a 1,020 N crate 3.50 m up to a shelf. How much work is done by the forklift on the crate?

The forklift does

⇒ 3,570 J of work on the crate. the answer is 3570

User Daniel Macak
by
8.5k points
3 votes

Answer : Work done on the crate is 3570 J

Explanation :

Force acting on forklift due to its mass is 1020 N

Distance covered in lifting it, d = 3.5 m

Mathematically, the work done is defined as :


W=F* d

So,
W=1020\ N* 3.5\ m


W=3570\ J

The forklift does 3570 J work on the crate.

Hence, this is the required solution.