167k views
0 votes
Sally can paint a room in 3 hours while it takes Steve 6 hours to paint the same room how long would it take them to paint the room if they worked together ?

2 Answers

5 votes
1/3 of an hour (Sally) and 1/6 of an hour (Steve).

So add the rates: 1/3 + 1/6 = 1/2. (1/3 is 2/6, and 2/6 + 1/6 = 3/6).

Since their combined rate is 1/2 of a room in one hour, it takes them two hours to paint the room.

-Hopes it Helped!
User Aruis
by
7.5k points
4 votes
There is a formula:
3 * 6 / (3 + 6) =
18 / 9
= 2 hours



User Christian Ziebarth
by
7.8k points