I need more math help, the!
Cement truck A can pour 200 cubic ft of concrete in 20 minutes. It only takes truck B 15 minutes to do the same job. If they both work together,how long will it take them to pour the 200 cubic feet?
I need help setting up the problem and solving it, thank you!