20.0k views
2 votes
One crew can seal a parking lot in 9 hours and another in 12 hours. how long will it take to seal the parking lot if the two crews work together?

1 Answer

5 votes
first crew = 1 lot in 9 hours, therefore 1 hour =
(1)/(9) of the lot.
second crew = 1 lot in 12 hours, therefore 1 hour =
(1)/(12) of the lot.
In one hour, both can seal (
(1)/(9) + (1)/(12)) of the lot, which is
(7)/(36)


(7)/(36) = 1 hour

(1)/(36) =
(1)/(7) hour

(36)/(36) = 5
(1)/(7) hour

So they need 5
(1)/(7) hour if they work together.

User Kevin Beck
by
8.4k points