Min-Ahn spends 1.5 hours creating a 35-slide PowerPoint presentation for his POM class, while Ying takes only 45 minutes to prepare his 28- slide presentation. Which of the following is correct?

a) Min-Ahn's productivity is 0.39
b) Ying's productivity is 37.33
c) Ying's productivity is 0.622
d) All of the above

1 Answer

8 votes

Answer:

A

C

Step-by-step explanation:

Productivity = total amount of slides created / total time in minutes

Min-Ahn's productivity = 35 / 90 = 0.3889

To convert Min-Ahn's time to minutes , remember that 60 minutes = 1 hour

so, (1 x60) + 30 minutes = 90 minutes

Ying's productivity = 28/45 = 0.622