Answer:
$2.95
Step-by-step explanation:
The cost per pen for job X24 is computed as;
= Total cost of pen / Total output
Total cost of pen = Direct material + Direct labor + Manufacturing over head
Given that;
Direct material = $1,500
Direct labor = $2,800
Manufacturing over head = $1,600
Total output = 2,000 pen
= $1,500 + $2,800 + $1,600
= $5,900 / 2,000
= $2.95