608
Explanation:
12.8 × 1.5 is 19.2 so 19.2 × 5 is 96 dollars in overtime and then 12.8 × 40 is 512 so 512 + 96 is 608
Answer:
$12.80 x40 + $512.00
1.5 hourly rate = $12.80 +$6.40 = 19.20 x 5 hrs. = $96.00
Fourth week of April $512.00 + $96.00 = $608.00
8.7m questions
11.3m answers