Answer: T -AXIS = 440
H-AXIS = 40
Explanation:
Hi, to solve this we have to analyze the information given:
- Hours worked per week: between 10 and 40 hours
So, the scale for the T-axis (total pay) of his graph should go from 0 to at least 440. We obtain this number by multiplying $11 (the price of an hour) by the maximum of hours he can work in a week (40).
Mathematically speaking: $11 x 40 = 440
And for the h-axis of his graph, it should go from 0 to at least 40, which is the maximum number of hours he can work in a week.