If 7 men can do a job in 24 days and 3 men are fired from the job how long will the remaining men take

User Facha
by
2.7k points

1 Answer

22 votes
22 votes

Answer:

36 Days to Do the job

Explanation:

User Walter Luszczyk
by
2.7k points