Answer:
A. environment and society
Step-by-step explanation:
- As the engineer is hired to find a newer form of electricity and like that of the wind he will first find a suitable location for the development of the wind power system and then make use of the suitable technology in placing the windmill, considered the place with plenty of winds and breezes in an open farmland or a open and wide area that is capable of producing the needed power.
- For this, he also needs to collect the data form the local stations and do some analysis first and then effectively plant the wind system so that the society can be benefited from its power. This is an example of the environment and the society.