12.5k views
0 votes
Why do companies use a predetermined overhead rate rather than an actual overhead rate?.

User AMGMNPLK
by
7.8k points

1 Answer

2 votes

Answer:

An actual overhead is not known until the end of the period

Step-by-step explanation:

User Maxletou
by
7.2k points