A person is working at a constant rate. If he produces 15 details in 8 hours, how long does he need to work to produce 18 details?

Let t be the time he needs to produce 18 details.
Write an equation please!!

User Vectrobyte
by
7.9k points

1 Answer

3 votes

t = 9.6

18 × 0.533 = t ?