Answer:
257 pounds
Explanation:
We have to assume that the "parts" are by weight. The total number of parts in a batch of concrete is 1 + 2 1/2 + 3 1/2 = 7, of which 6 are sand and gravel. The total weight of sand and gravel required for 300 lbs of concrete is ...
... (6/7)×300 lbs ≈ 257 lbs
_____
The actual amount is 1800/7 = 257 1/7 lbs, according to the recipe. For this sort of recipe and for this quantity, it is not unreasonable to round the answer to the nearest pound.