143k views
4 votes
If 7 men can do a job in 24 days and 3 men are fired from the job how long will the remaining men take

User Guysigner
by
5.4k points

1 Answer

9 votes

Answer:

36 Days to Do the job

Explanation:

User Terje Dahl
by
5.3k points