A 27 1⁄2-mile stretch of road needs repaving. A company bid on the repaving project, saying they would repave 2 1⁄4 miles of road per week. How many weeks will the company take to completely remove the stretch of road?

User Wombatz
by
5.7k points

1 Answer

0 votes

Answer:

The correct answer is 12 and a half or 13 weeks.

Explanation:

First, convert the values to decimals.

27 1/2 = 27.5

2 1/4 = 2.25

Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.

27.5/2.25 = 12.2222222222222

Round that up to 12 and a half weeks or 13 weeks.