55.1k views
2 votes
You work for a company that is installing a sewer manhole. The chamber and piping under the manhole are to be buried in the ground. You must dig a hole large enough for the manhole chamber and its concrete base. The dimensions of the chamber and base are in a drawing. Use the drawing below to answer this question. Click on enlarge to see a larger view of the drawing. Enlarge drawing select the best answer based on the drawing, what is the minimum diameter for the chamber and its concrete base? 4 feet 4 feet 10 inches 5 feet 10 inches 6feet 10 inches

User Kjb
by
8.1k points

1 Answer

2 votes
I honestly don’t know I’ve tired re-reading it over and over and idk I’m so sorry
User Arun Nalpet
by
7.5k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.