177k views
5 votes
two objects each weighing 2kg are lifted through the same distance in 4s and 1s respectively. which scenario requires more work?

1 Answer

4 votes

i believe it would be the same because time doesn't matter when calculating total work done.

Work=FxD

F=force

D=distance


User Alexis Abril
by
8.1k points