109k views
1 vote
Toan is building tables for a park department he needs 20 bolts for each table if he has 60 bolts at his work place and he gets 300 more bolts from from the supply room how many table can he build?

User NkS
by
5.4k points

1 Answer

7 votes

Number of bolts he needed to build a table = 20

Number of bolts he has = 60

Number of more bolts he gets from the supply room = 300

So, total number of bolts he has now = 300 + 60 = 360


Number of tables he can build = (Number of bolts he has)/(Number of bolts required for one table )

= 360/20

= 18

Hence, he can build 18 tables.

User Pasuna
by
5.8k points