10.4k views
3 votes
Elena agrees to finish a knitting project for a friend. The graph shows the number of rows Elena completes compared to the amount of time spent knitting.

Assuming she worked at a constant rate, how many rows had been completed before Elena started working?
12
14
15
19

Elena agrees to finish a knitting project for a friend. The graph shows the number-example-1

2 Answers

6 votes

The answer is 12. :)

User Galdikas
by
5.2k points
4 votes

First of all, using the information about constant rate we can say that these points are located on a straight line. Indeed, the logic is about a constant rate. Then, we can easily claim that the points are located on a quasi-linear function, y=kx+b. We could solve this problem by setting up a system of equations. The system is this:


\left \{ {{19=14k+b} \atop {22=20k+b}} \right. \\

By solving it, we find that k=0.5 and b=12. Then the function is y=0.5x+12

We have to find that how many rows were completed, before Elene started, i.e, x = 0. Then y=0.5*0+12 = 12. The answer is 12 rows.

User Sajeed Kannoje
by
5.8k points