Answer: There are approximately 9 loads.
Explanation:
Number of tons the cement weigh is given by
Weight of each load =
So, Number of tons is given by
Hence, there are approximately 9 loads.
Convert the 6 1/3 tons into an improper fraction:
6 1/3 = 19/3 tons.
Divide 19/3 tons by 3/4 tons per load:
19/3 / 3/4 = 19/3 * 4/3 = 76/9 = 8.4, so it will take 9 trips.