183k views
3 votes
So, without more workers (there's a hiring freeze) and without forklifts, all of the metal has to be loaded by hand by these six workers in two weeks. but how do you do that

1 Answer

1 vote
the metal has to be loaded by hand by these six worker
User FLBKernel
by
5.1k points