A masonry contractor is preparing an estimate for building a stone wall and gate. He estimates that the job will take a​ 40-hour work week. He plans to have three laborers at ​$14 per hour and six masons at ​$24 per hour.​ He'll need ​$3143 worth of materials and wishes to make a profit of ​$500. Write a mathematical statement that will give the estimated cost of the job. Then calculate this total.

2 Answers

5 votes

Answer:

The total cost will be $11,083

Explanation:

The total time taken to build the wall = 40 hours

There will be 3 labors at ​$14 per hour totaling to =


3*14*40=1680 dollars

There will be 6 masons at $24 per hour totaling to =


6*24*40=5760 dollars

Cost of materials = $3143

Profit amount added = $500

The estimated cost becomes:


1680+5760+3143+500=11083 dollars

Hence, the total cost will be = $11,083

User Savion
by
8.2k points
2 votes

Solution: Estimated time for the work is 40 hour work week.

Estimated payment to 3 laborers working 40 hours at cost $14 per hour is:


3* 40* 14= $1680

Estimated payment to 6 masons working 40 hours at cost $24 per hour is:


6* 40* 24= $5760

Estimated cost of material = $3143

Contractor wishes to make a profit of $500

Therefore, the mathematical expression that will give the estimated cost of the job is:


Cost = 1680+5760+3143+500

The estimated total cost is:

Cost =$11083