We work in rates per hour so we have the equation:-
1/20 + 1/15 + 1/x = 1/6 where x is the time for the third pipe
1/x = 1/6 - 1/15 - 1/20 = 1/20
so x = 20
The answer is 20 hours.
6.4m questions
8.5m answers